Check our Quick Links! |
The first step in constructing a septic system with a sandmound is to bring in equipment to tooth-up the bed area and build banks for the installation of the system. Next, a bunch of tons of sand has to be brought to level off the septic system. The pictures below show the delivery of the sand and leveling the sand. (Click on the images for a larger picture) |